☀️Solar & Photovoltaic (PV)

Solar & Photovoltaic (PV) & Solar Output Calculator

Solar yield, SEG export & battery sizing

📍Location-calibrated simulation by town or outward postcode:

Yield Model

Solar Yield London

Simulated with local solar irradiance (986 kWh/kWp) and roof geometry.

Annual Yield
4,437
kWh / yr
Peak System Power
4.5 kWp
1 kWp (Small / Garage)20 kWp (Full Roof)
Roof Geometry
Annual Household Load
kWh
Electricity Unit Rate Auto-Sync
p/kWh
Currently calculating with: 25.4 p/kWh
📍London (986 kWh/kWp)
Energy Distribution
100% PV
Self-Consumed1,149 kWh26 % on-site
Grid Export (SEG)3,288 kWh74 % exported
Total Net Benefit
£687/ yr
approx. £57 monthly bill offset
Utility bill savings:+ £292
SEG export revenue:+ £395
Est. Hardware Cost~£6,686
Payback
~9.7 yrs

❓Frequently Asked Questions: Solar & Photovoltaic (PV)

Key UK engineering benchmarks, Ofgem standards, and clean energy incentives at a glance:

How much electricity does a 1 kWp solar array produce in the UK?▼
In the United Kingdom, 1 kWp of installed solar PV generates approximately 850 to 1,050 kWh annually. Yields are highest along the South Coast (~1,050 kWh/kWp) and slightly lower in Northern England and Scotland (~850 kWh/kWp).
Do residential solar installations qualify for 0% VAT in the UK?▼
Yes. Residential solar PV panels and domestic battery storage qualify for 0% VAT relief on Energy-Saving Materials until March 2027, substantially lowering upfront capital outlay.
What is MCS certification and why is it essential?▼
The Microgeneration Certification Scheme (MCS) certifies installer competence and product quality. Having an MCS compliance certificate is a mandatory prerequisite to register for Smart Export Guarantee (SEG) payments.
How does the Smart Export Guarantee (SEG) pay for surplus solar?▼
Under the Smart Export Guarantee (SEG), licensed energy suppliers pay domestic solar owners for every kilowatt-hour exported to the National Grid. Competitive export tariffs range between 5p and 15p+ per kWh.
Do I need planning permission for rooftop solar panels?▼
In most UK residential properties, rooftop solar falls under Permitted Development Rights, meaning full planning permission is not required unless your home is listed or situated in a designated conservation area.
What DNO permissions are required (G98 vs G99)?▼
Systems with inverter output up to 3.68 kW (16A) on a single phase qualify for standard ENA G98 notification (fit and notify). Inverters exceeding 3.68 kW require prior application and approval under ENA G99 from your local Distribution Network Operator.
💡

Suggestion or Feature Request?

Are you missing a specific calculation, UK regional metric, or export tariff? We welcome any feedback from homeowners and energy professionals.

🐞

Report an Issue

Did you spot an inaccurate calculation, incorrect town data, or broken link? Let us know directly so we can patch it immediately.

Our Tool Network

Independent Calculation Engines for Every Decision

100% Free · No Sign-Up Required
GridKalk LogoGridKalk
Clean Energy

Engineering simulations for rooftop solar, heat pumps, home battery storage, and smart EV charging in the UK.

Current Platformgridkalk.co.uk/
Kalkulero LogoKalkulero
Finance & Math

Over 200 specialized online calculation tools for personal finance, math, and daily decisions.

Visit Kalkulerokalkulero.com